Ultra DeepWater Consulting
Drilling, Completion and Workover Consultants
Ultra DeepWater Consulting | Links | Careers | Contact Information | Home
Ball What we can do for you?
Ball My expertise
Ball "been there, done that!"
Ball Other experience!
Ball Distinct differences of deep versus shallow water!
Ball Deep water considerations.
Ball Drilling contractors
Ball Your savings!
Ball My Down hole experience
Ball My role representing you!
Ball Together we can prevent problems!
Ball Some of the training I received!
Ball Some accomplishments!
Ball Personal
Slide 13Some accomplishments
  • Successful transformation of the Sedco 707 from shallow water anchor to Ultra deep water “Dp” working for Petrobras.
  • Start up of the "DP" vessel “Amethyst 1” for Petrobras working in up to 3000' performing completions, workovers and well repairs.
  • Re-fit of the "DP" Drill ship "Sedco 472" and start up of her contract for Petrobras in the Campos Basin.
  • Successfully drilled relieve well for the “Anchovy” blow out in shallow water “DP” mode with the "DP" Semi-Sub "Sedco 709".
  • Winner CAODC safety award leading a crew for 250 working days without a lost time accident 1985.
  • Build and install a new uptake riser for the Petrobras production platform  P-23 made by “Allstate” on "Amethyst 1"
  • Build and install 18.3/4 inch 15000 psi Hydrill BOP onboard "DP" vessel "Sedco 707", test and run same in 6500' water with no apparent operational problems!
  • The very successful building and startup of the 5th generation DP vessel “Pride Brazil” with very little down time and accident free in her first six months of operation offshore Macae, Brazil. (Drill Supt.)

reneritter@ultradeepwaterconsulting.com

10 Picco Drive, Paradise, NL, Canada.

Phone 709 773-0055 Fax 709 773-0322 Cell 709 682-3926

 

 

©2004 R Ritter All rights reserved

Ultra DeepWater Consulting | Links | Careers | Contact Information | Home