-
Station keeping . DGPS problems versus acoustic limitations.
-
Well planning, Casing programs, formation break down, Mud weights used on top hole, Solids and cuttings removal, circulating rates, Penetration rates, etc.
-
EDS situations. Preparedness, abandonment without major damage to rig or well head.Re-connect of LMRP to BOP’s.
-
Riser tensioning, using “stress engineering” calculations and methods.
|
 Cyber base drilling chair “B” Pride Brazil
reneritter@ultradeepwaterconsulting.com
Phone 709 773-0055 |